| IDENTIFICATION |
DEFINITION |
PRIMARY
|
MINIMUM
|
TOP |
|
Activity Based Costing (ABC) Spreadsheet |
Complex
Excel spreadsheet to convert financial and operational data into standards
labor and overhead rates for each "activity" or work center. File: ABC Work
Center Rate Calcs .xlsx |
Controller |
5 years |
JCOST |
| Affirmative Action Program |
Specific observations and goals to promote the
objectives of equal employment opportunity at Trinity Forge, Inc |
HR Manager |
10 years |
EEOAA |
| AMMS
replaces MP2 |
Software package to monitor maintenance tasks and inventories.
|
Warehouse Administrator |
|
PREVM |
| Approved
Vendor List |
Vendors
approved to receive purchase/work orders, including approved-for codes.
Stored in computer and accessible to authorized purchasing personnel.
"DOCUM(b)" document that is distributed at least monthly. |
QA Manager |
|
SAPVL
SUBCO
DOCUM
|
| Authorization for Treatment and Report |
Authorization from Trinity Forge, Inc. for injured
employee to seek medical treatment for job-related injury. |
Supervisor or Foreman |
6 years |
ACDNT |
| Bill of Lading |
Trucker's shipping document. Copy filed in "Bill
of Lading" file in Sales Department |
Sales
Operations Manager |
20 years |
FINIS |
| BOM
(bill of material) <kept on-line> |
BOM
(bill of material) tells what tooling and material is needed to make a part;
the diameter, size of the material; if stud weld is needed. |
Manufacturing Manager |
|
JSTRT CUTIT PSCHD |
| C=0
Sampling Plan |
Zero
acceptance sampling plan and associated acceptable quality levels. |
QA
Manager |
|
POSQC
HARDT |
| Cad/Cam
File |
Computer document defining the shape of a part with it's geometry and
verbiage. Includes the CNC file. There is generally a 3D solid model. |
VP
Quality & Engineering |
20
Years |
PRDEV |
| Calibration Control System <on
computer & hardcopy> |
Database of all calibrated instruments, including current status and
recalibration dates. Maintained on
the Network accessible from
Calibrations Clerk personal computer with individual readings kept on paper
in file. |
Calibrations Clerk |
5 Years |
CALIB |
| Cast
Report |
Dimensional analyses (typically from Coordinate Measuring Machine) of patterns, casts,
etc. Stored in Engineering files.
|
Engineering Assistant |
20 years |
CASTS
PATRN
SECTL |
| Certificate of Material (certs,
certifications) |
Our
certificate of material, including test results and citing specifications
observed, provided to customer. |
QA
Manager |
30
years |
AFTSH |
|
Certification of NDT |
Written
statement that an individual has met the applicable requirements for NDT
method. |
QA Manager |
|
|
| Concession/Change Order
Document (email) |
Document used to record customers' in-process order
changes and any waiver (concession) obtained from customer. Filed in Customer PO file if
it pertains to a specific PO or in Engineering files if it applies to future orders. (This
combines the obsolete Concession Document and Change Order Check List) |
Sales
Operations Manager |
20 years |
CHNGE
HURRY
|
|
Corrective Action Report (CAR) |
E-mailed based document for addressing deficiencies. The name 'report' in
the name is strictly traditional carry-over from pre-computer days. Located
in CAR Control File |
President |
5 years |
CARRR |
| Corrective Action Report (CAR) Control File |
Shared
e-mail file <on computer> to control processing of CARs and PARs through
various stages from initiation through final effectiveness review then
archiving. Subdivided into Chronological categories, each in user-defined
sequence. |
President |
5
years |
CARRR |
| Customer Complaint Report (CCR) |
Document for
controlling review and resolution of customer complaints. Computer File. |
QA
Manager |
5 years |
CUSTC |
| Customer PO File |
Folder containing all customer purchasing and contract documents
relating to a parts order as well as the repository of subcontract, testing and shipping
records. Maintained in Sales area, alphanumerically by customer ID (see Cross-Reference
Packet for IDs and customer PO number. |
Sales
Operations Manager |
20 years |
ORDER |
|
Customer Grade
Codes
S:\Purchasing\customer grade codes.xls
|
Spreadsheet used to assign
the customer part number; place any
customer heat codes that need to be stamped on the parts into the notes in
the Router. |
Materials
Manager |
|
CUSTC |
|
Customer Master |
Detailed instructions in M2M's customer profile listing any special
requirement for production, machining, inspection, outside work performed,
and shipping. |
Sales Operations Manager |
20
years |
|
| Customer File |
Folders containing customer-related data not specifically linked to a
particular parts order. Contains correspondence, quotations and die sale information.
Maintained in Sales area alphabetically by customer ID (see Cross-Reference Packet for
IDs). |
Sales
Operations Manager |
20 years |
QUOTE
NEWDI |
| Customer Specifications |
Customer specifications scanned and made available on the computer to
prevent loss of paper versions of specifications , etc. When the
specification is replaced the obsolete specification is then put in the
Customer Obsolete File.
|
QA
Manager |
|
TPSMM |
| Customer Survey |
Survey of Trinity Forge customers to measure their satisfaction,
i.e., delivery, dimensions, specifications. |
VP Sales |
10 years |
CSRVY |
| Customer Survey
Plan |
Electronic
Spreadsheet including the year's schedule for customer surveys and
strategies planned for stimulating response |
VP Sales |
3 years |
CSRVY |
|
Customer Service Request (Formerly Returns & Allowances template (R&A) |
Document controlling the processing of parts returned by a customer. Stored
in Customer PO file. |
QA
Manager |
20 years |
RTRNS |
| Cycle
Count Form |
Turnaround document used to control cycle counting. After completion filed
in Inventory Files in chronological order. |
Accounting Manager |
3 years |
MCRIB
CYCLE |
|
Daily Scale Checklist
|
Form used in recording scale accuracy. Maintained in Shipping files.
|
Production Scheduler |
Six months |
FINIS |
| Data Reentry Note |
Notification routed for verification that data has been reentered into
computer after system failure. Stored in IT Manager's files in
chronological order. |
IT
Manager |
1 year |
SYSTM |
| DLIST |
On-line
document listing all documents and records, noting responsible party,
retention time for records and in which procedures the documents are mentioned |
TOPs
Clerk |
|
Quality Manual |
| DOC.xls
(on computer) |
A document, stored
on the PC server, which includes instructions on all "DOCUM(b)".
Also includes frequency of each report, distribution lists and
confirmation of returned obsolete documents. |
QA
Assistant |
|
DOCUM |
|
Die Impression Cast Approval Letter
|
Letter sent with the Die Impression Cast to the customer. The customer signs and
returns the letter when the cast is approved. Stored in the Engineering files.
|
Engineering Assistant |
10
years |
CASTS |
| Die
Material Cycle Count Form |
Form
used to record steelyard cycle count information. (
S:\ACCTNG\INVENTORY COUNTS\DIE
MATERIAL CYCLE COUNT.xls) |
Accounting Manager |
|
CYCLE DSCON |
| Die
Material Inventory Report |
Blank form
used to record steelyard cycle count information (
S:\ACCTNG\INVENTORY COUNTS\DIE
MATERIAL CYCLE COUNT.xls) |
Accounting Manager |
|
CYCLE DSCON |
|
Die Machine Schedule
|
Schedule used by Machine Department for scheduling die and die tooling work.
|
CNC Programmer |
|
DIMKR |
| Dies
Pulled Form |
Form
used when pulling dies from production area. |
Manufacturing Manager |
|
|
| Die Storage Log |
Form used to record die storage locations and to update Tooling
program. Maintained in the Die Storage Log binder in Die Prep area. |
Die
Shop Supervisor |
6 months |
TOOLT |
|
Dispatch List |
The
Dispatch List contains jobs that are scheduled to be made and is sent daily
to the Supervisors. |
Production Control Manager |
Daily |
PSCHD |
| Discrepancy Reports |
Machining: Form
used to document rejection of parts at the Machining Division. Filed with
Purchase Order. Forging: Form used to document
rejection of parts at the Forging Division.. Scanned into computer program. |
Machining
Department
QC Inspector Forging QC Supervisor |
5 years |
MOPQC
NOCON
MOPPP
MORDR
|
|
Disposition Tag |
Tag
used to place questionable parts on hold until a sample can be sent to the
customer for their acceptance or rejection. |
QC
Supevisor |
|
NOCON |
| Employee Benefit
Plan Document |
Document produced by Health Plan administrators |
HR Manager |
|
BENFT |
| Employee Review |
Form used to coordinate and record probationary and periodic review of a team member's
performance. Filed in individual's personnel file.
|
HR Manager |
Lifetime of employment plus 10 years |
TRECS |
|
Employee Stamp List
|
List of what inspector or operator stamps have been checked out to whom.
|
QA
Assistant |
|
STAMP |
|
Employee Statement of Injury |
Statement taken from injured employee regarding circumstances of his/her accident.
|
HR
Manager |
6 years |
ACDNT |
|
Engineering Files
(engineering prints & drawings including forging, die & machine drawings &
die layouts)
|
Files scanned into a computerized format.
|
Engineering Assistant |
5
years |
PRINT |
| Environmental File |
Repository of all environment
-related records, including the EMS Annual Report, environmental reports
submitted to the government and, if any , public environmental |
HR
Manager |
10 Years |
ENVIR |
| Environmental
Management System (EMS) Annual Report |
A document
(Possibly set of documents) developed with the aid of an environmental consultant
reviewing the status of the company environmental program against the law
and ISO 14000 including the environmental plans and goals for the coming year
as well as an executive summary presented for management review. |
HR
Manager |
10 Years |
ENVIR |
|
"Eyeballs” sticker |
Testing of QC Inspectors, QC Leadman, Post Forge Workers that
work on the inspection table, or anyone doing a visual
inspection of a part as part of final review. This testing will be
administered annually and the employee will be identified with an “Eyeballs”
sticker and calibration
date on their hard hat. |
Calibrations Clerk |
Annually |
CALIB |
| Expected Delivery
Date Report |
Report run on a
weekly basis to show what steel has been ordered and when the anticipated
delivery is expected "DOCUM(b)" document printed at least weekly |
Materials
Manager |
|
RECRM |
| Family
or Medical Leave Request Form |
Family/medical leave request form available
through Company's Human Resources Department used to notify the Company that
you desire family/medical leave. |
HR
Manager |
|
FMLAP |
| FG- Racks Spreadsheet <on computer>
<now M2M> |
Excel spreadsheet used to track finished parts stored in the racks in the
Shipping
Department. It is also used to track customer-supplied forgings and castings while they
are onsite.
|
Production Scheduler |
10 years |
FINIS |
|
Finished Goods Inventory Count <M2M>
|
Electronic spreadsheet maintained by Shipping Dept. to record exact location of parts
until shipped.
|
Accounting Manager |
|
FINIS
CYCLE |
| First
Article Inspection |
Inspection of a specific number of sample parts required by a customer to
verify geometric and/or procedural features of a new product. First Article
Inspections require a formal customer approval process before full scale
production can begin. |
QA
Manager |
7 years |
QARTI ORDER |
|
Flight Safety
Requirements |
All measurement and test equipment used
to inspect Flight Safety Parts is discriminate to within ten percent (10%)
of the total tolerance spread for the feature being inspected. For total
tolerance spreads of less than .001 inch, measurement equipment is
discriminate to twenty percent (20%) of the spread. Equipment less
discriminate is used with the specific approval of the customer. |
QA
Manager |
|
CALIB |
Forging Materials Reference List
<formerly Color Code Chart> |
List
of color coding used on raw material bar ends. Maintained with other data
regarding raw material grades in computerized inventory system. Distributed
annually unless there is a change, then as required |
Materials
Manager |
Annually |
COLOR |
|
Form Master File
|
Master Forms Copies are kept on the server
|
Accounting Manager |
|
FORMS |
|
Furnace Temperature Log
|
Daily report of temperatures of each operating furnace. Stored in Maintenance Foreman's
files chronologically.
|
Special
Products Coordinator |
1 year |
FTEMP |
|
Gage Control System (including gage status record) <on
computer>
|
Database of all gages, including current status and recalibration dates. Maintained on
network by Calibrations Clerk.
|
Calibrations Clerk |
5 yrs |
GAGES |
|
Gage Post-it |
A self-stamping label the Calibrations Clerk places on the master forging drawing of any die
with a gage in the Gage Control System so the gage will be checked if the drawing is
changed. |
Calibrations Clerk |
10 years |
GAGES |
|
Gage Wear Record
|
Record of Machining Division's calibration of gages including
tested dimensions and status. Maintained by Metrologist.
|
Calibrations Clerk |
5
years |
GAGES |
|
Gas Furnace Operation
Procedures |
Documents that explain startup and
shutdown Procedures of gas furnaces 306,307,310,311 and 315.
|
Maintenance Engineer |
|
|
|
Grinding Verification Log |
Form
used stating a visual inspection was done on work in process. |
QC
Forging Supervisor |
10
Jobs, 3 years minimum |
POSQC |
|
Hammerlogs
|
Form filled out by Hammerman to show hours and down time codes
for each job run on a hammer during a day. Data entered in computer. Stored in
file boxes in front office for 1 year, then destroyed.
|
Manufacturing Manager |
1 year
|
FORGE
FINIS |
| Hammer
Scrap Log |
Form
filled out by the Hammerman for scrap count and causes . Counts are scanned
into M2M by the Hammerman. Hammer Scrap Logs are forwarded to the Materials
Clerk who enters scrap causes into M2M. |
Manufacturing Manager |
online |
CDCHG
SCRAP |
|
Hardness Calibration
|
Calibration of Brinell and Rockwell testers.
Results recorded in Gage Manager.
|
Calibrations Clerk |
|
HARDT CALIB |
|
Hardness Inspection Sheet
|
Form recording the readings taken in hardness
testing. Recorded in SPC after readings completed.
|
Post Forge Supervisor |
|
HARDT |
|
Heat Code Info <in M2M program on
the computer>
|
Computer database system (M2M) of chemistry and testing
history of each heat code. Data used throughout the system.
|
Materials
Manager |
10 Jobs,
3 years minimum. |
RECRM
OTEST |
| Heat
Treat Chart |
Form
used to record Internal Heat Treat furnace time and temperatures. |
Manufacturing Manager |
10
years |
TREAT |
| Hotcell |
Sheet
with die number, hammer, date, heat method, tong, temp; material, material
size, length, and weight; heat time, pieces per load, and notes used by the
hammer crew for blow pattern and set-up. |
Forging
Production Supervisor |
|
FORGE |
|
IDEAS Suggestion
|
Document controlling the processing of a team member's suggestion through the IDEAS
program (previously called "$uggest-a-$hare"). Stored in IDEAS Clerk's files
chronologically by initiation.
|
IDEAS Clerk |
10 years |
IDEAS |
|
InfoSys Database
|
Microsoft access database that is used to record installation and support information
for each software program installed on Trinity Forge's personal computers.
|
IT
Manager |
|
SYSTM |
| Inspection Sampling Sheet |
Sampling table for normal inspection giving lot or batch size, general
inspection levels with acceptable quality levels. i.e. General Inspection
Level l with acceptable quality level 2.5 using a sample size code letter to
determine the sample size based on the number of parts forged. A copy of the
Inspection Sampling Sheet is distributed to personnel performing
inspections. |
QC
Supervisor |
|
POSQC
HARDT |
|
Internal Audit Report
|
Report of
findings of Internal Quality Audit Committee produced for each internal
audit. Now stored electronically.
|
Audit Manager |
5 years |
IAUDT |
| Internal Cast Status |
Email template used by Engineering Assistant to send die impression approval/disapproval status
to Materials/Scheduling Supervisor and all other pertinent parties.
|
Engineering Assistant |
1 year |
CASTS |
|
Internal Process Review Form |
Form
used for die/tooling reviews. |
QC
Supervisor |
|
PROQC |
|
Internal Quality Audit Schedule
|
Annual auditing plan maintained by Audit Manager. Saved in Audit Manager's
files (on computer)
|
Audit Manager |
10 years |
IAUDT |
|
Internal Specification |
Documents identifying internal specification
requirements as deemed necessary by VP Quality and Engineering Manager |
VP Quality and Engineering |
|
ISPEC |
|
Inventory Adjustment Ticket
|
Form used to facilitate the use of raw material inventory to use for non-production
purposes, i.e., tooling, maintenance, etc.
|
Steelyard Supervisor |
1
year |
MNTRM |
|
Inventory <M2M> |
Consist
of Item Master, On-Hand by location, Material Availability, Inventory
Movement, Valuation, Performance, Cycle Counting, and Physical Inventory. |
Production Scheduler |
|
FINIS |
|
Invoices and Related Paperwork
|
Invoice, export papers, etc. sent to customer subsequent to shipment. Copies saved in
Customer PO file.
|
A/R Clerk |
20 years |
AFTSH |
| Item
Master (in M2M computer program)
<Replacing TPS> |
The M2M
computer program used for translating customer specifications into Trinity
specifications. |
Sales
Operations Manager |
On
computer |
|
| Item
Master Checklist |
Computer program used for the set-up of new part
numbers and specification and the review of revised parts numbers and
specification |
VP
Quality & Engineering |
On
Computer |
|
|
Job Analysis
|
Job cost report from previous system. Replaced by
Profitability Spreadsheet.
|
|
|
|
|
Job Optimization <on computer>
|
Program to pull in Jobs info, allow a Production Foreman to enter variables, and to
determine best choice of available process variables for a job.
|
Production Scheduler |
|
JSTRT |
| Job
Order |
Document issued to initiate work, track cost and maintain traceability. |
Production Scheduler |
3 years |
AFTSH
DCORD
ORDER |
|
Jobs Info <on computer>
<now M2M computer program>
|
The primary central computer database system for tracking orders. Directly linked with Inventory system. Data
from this database is used throughout the computerized systems. |
Production Scheduler |
30 years |
AFTSH
DCORD
ORDER |
| Lab
Test Reports |
A
report prepared by an independent lab for Mechanical Properties:
including toughness, strength or stiffness, i.e. Tensile Test.
Chemical Properties: chemical composition of elements of a solid
structure of material, i.e. Chemical Analysis;
Physical Properties: properties to define density and thermal
behavior of material, i.e. Microstructure Examination.
The information is scanned and stored in a computer data program.
|
QA
Manager |
30 years |
OTEST
HARDT
CHEMC |
|
Last Part Inspection
|
Report prepared regarding the dimensions of a part made toward the end of a forging
run. Typically done on same inspection sheet as first part inspection, etc.
Scanned into
QC computer data
files.
|
QC
Supervisor |
10 Jobs, 3 years minimum |
PROQC |
| M2M
(on computer) |
Program for all procedures from start to finish. This includes sales,
quoting, purchasing, production, machining, inspection, outside work
performed, engineering information, and shipping. |
|
|
MOPPP FORGE
JSTRT
FINIS RECOM PATRN |
|
Machine Utilization Report (previously Machine Downtime Report)
|
Report maintained in computer to record downtime, tooling, and fixture problems at
Machining Department. Stored in computer for future reference.
|
Machining Department Manager |
|
MOPPP
MORDR
|
|
Machining Procedure Specification (MPS)
(In part Production Floor Traveler in M2M) |
Computer generated packet containing specific job information for a particular
machining job. Packet contains MPS Cover Sheet, Operations Orders, Inspection Orders, Inspection Records
and Operation Pick Lists. MPS "travels" with machining job throughout all
process. Ultimately filed in Customer PO file.
|
Machining
Department Manager |
30
years |
PRDEV
MOPPP
MOPQC
STAMP
DIMKR
MORDR
MPSMM |
| Machining Schedule |
Set of computerized documents maintained to control which machining operation is to be
produced on each piece of Machining Department equipment. Not archived. |
Machining Department Manager |
|
MORDR
BRKDN |
|
Magnetic Particle Certification
|
The certified results of the magnetic particle examination of forgings with the
pertinent information required by the customer. Original filed in customers purchase
order file. Traceability copy kept in QA Managers file. |
QA Manager |
10 years |
MFLUX |
|
Magnetic Particle Inspection Log
|
A record of the date,
job number, heat code, part name, quantity examined by magnetic particle
inspection, and the results. Filed by the magnetic particle inspection machine. |
Post Forge Supervisor |
10 years |
MFLUX
PREQC
|
| Maintenance Work Orders |
Document detailing what needs to be done and what has been
done for each maintenance project of more than a few minutes duration. Discarded
after info entered into AMMS.
|
Manufacturing Manager
|
5 years |
BRKDN |
| Management Review
Packet |
Gathering of
documents for review by Management Review Committee including CARS and
PARS, Audit Results, etc. Packet is attached to Management Review
Committee Report |
Audit Manager |
3 Years |
MREVU |
|
Management Review Committee Report
|
Formal report of Management Review Committee as presented to President.
Paper copy maintained
as a record in Management Review File.
|
President |
5 Years |
REVUE |
|
Manager's/Supervisor's Report
|
Statement taken from Manager or Supervisor regarding employee injury. Filed in
employee's injury file.
|
HR Manager |
6 years |
ACDNT |
|
Material Availability Report |
This
provides a time-phased item availability report. The demand date is compared
to the scheduled receipt date (supply date). The material available quantity
will become negative if the demand date precedes the supply date. The report
has an option which can be used to select a lookup to look only through a
certain date. |
Materials Manager |
online |
DOCUM |
|
Material Grade Report |
A
document, stored on the PC server, which includes distribution. (DOC.xls) |
Materials
Manager |
|
DOCUM |
|
Material Inventory Report and Cycle Count Form |
A physical count of all materials in the Machine
Department |
Accounting Manager |
3 years |
CYCLE |
|
Measuring Instrument Verification Log
|
Log used by QC Dept. to log date and time of calibration of
measuring instruments. Used to determine latest base date when an instrument is
out of calibration.
|
Calibrations Clerk |
1 year
minimum |
CALIB |
|
Mill Test Report
<now stored on computer database under Mill Certs>
|
Chemical analysis provided by raw material suppliers and the basis for Heat Code info.
Copies sometimes provided to customers with certifications. Stored in
Materials Manager files by heat code. <now stored on computer>
|
Materials
Manager |
30
years |
RECRM |
|
Mil-Std-105E |
Sampling table for normal inspection giving lot or batch size, general
inspection levels with acceptable quality levels. i.e. AQL Inspection
Sampling Sheet |
QA
Manager VP Quality & Engineering |
|
HARDT |
|
Model Status Record
<on computer> <obsolete> |
Database of all tracing models, including current status and location.
Maintained on network by Engineering Assistant. |
Engineering Assistant |
|
|
| Morning
Operations Meeting Agenda |
Shared
electronics spreadsheet (included with Op Plans) that contains each topic currently being followed in
the Morning Operations Meeting, briefly showing progress to date as well as
the who-and-when of the next progress report. |
President |
1 year |
MEETG |
| NOCON
File Folder |
File
folder in QC Manager's office used to place Production Floor Traveler when
pulled from circulation to prevent non-conforming parts being shipped.
|
QC
Supervisor |
|
NOCON |
|
Obsolete File |
File (OBDLST)
where any specification, document, form or record is kept when it has been
made obsolete.( i.e. Customer Specification Obsolete File) |
Any
Manager |
|
|
| On The
Job Training Form |
Form
used by the Training Coordinator to record task learned testing, and
other training needed. Filed in employee's file. |
Training Coordinator |
Lifetime of employment plus 10 years |
TRECS |
|
Operation Order
|
Document included with MPS
containing specific instructions for each operation on a machining job. |
Machining
Department Manager |
|
MOPPP
MORDR |
|
Operation Pick List
|
Document included with MPS
assigning specific tools and fixtures for each operation on a machining job.
|
Machining Department Crib Attendant |
|
MORDR |
| Op
Plans (Operations Plans) |
Detailed action
items for developing the company, including Quality Objectives. Maintained
in an Excel spreadsheet by the president. Paper copy maintained as a
record in Management Review File. |
President |
5 Years |
MREVU |
|
Orders Due List
|
Key guide to what jobs need to be shipped, when, and their status.
|
Production Scheduler |
|
ORDUE |
|
Other Raw Material Inventory System <on computer>
|
Computer database system for other raw material inventories. These are currently
entered in different types of computer systems (also spreadsheets) which
will eventually be combined into a single type in M2M |
Machining Department Crib Attendant and Warehouseman |
|
RECOM |
| Out-of-Calibration Report |
Document to control the review and re-inspection of products checked with
instruments later found to be inaccurate. |
QC
Supervisor |
10 years |
RECHK |
|
Part Certs <on computer>
|
Program used to store test results preformed by the
laboratory; (i.e. Chemical Analysis, Tensile Test and Charpy Impact Test)
|
QA
Manager |
20
years |
OTEST |
|
Packing Slip
(Obsolete)
|
Shipping document similar to invoice sent to customer with shipment. No copy
maintained, but copy of invoice maintained in Customer PO file.
|
Shipping Lead Man |
|
FINIS |
|
PART CONVERSION REQUEST |
An email sent to the QA Manager and a copy to
the Sales Manager stating that a part conversion must take place, including
the requestor's name, date of request, reason for request, old part number,
old heat code, quantity to be converted and new part number. |
Shipping Supervisor |
|
TRANS |
|
Part Inspection Sheet
(including first part and last part inspections) Also
maintained in SPC program
|
Form completed for first-part inspections, last- part
inspections, etc. Scanned into
QC computer
files.
|
QC
Supervisor |
10 DSNs, 3 years minimum |
PREQC
NOCON
POSTP
|
| Pattern
List |
List of
all patterns kept in storage. |
Engineering Assistant |
Life of
Pattern |
PATRN |
|
Pattern Status Record <on computer>
|
Database of all patterns, including current status and location. Maintained on
engineering Assistant's personal computer.
|
Engineering Assistant |
|
PATRN |
|
Personnel File
|
Folder kept for each team member with general employment records. Maintained in
clerical area in alphabetical sequence.
|
HR Manager |
Lifetime employment plus 10 years |
TRECS |
|
Personnel Qualification and Certification form |
Documented requirements for qualifications of NDT candidates |
QA
Manager |
|
|
| Pick
List |
Form
issued to communicate the need for materials and allow the issue of these
materials. Form specifying what die material is to be cut in what dimensions
for a die. Filed with closed Job Orders. |
Die
Shop Supervisor |
1 year |
DSCON |
| Post
Forge Scrap Log |
Form
filled out by Postforge and QC personnel for scrap count and causes. Ultimately scanned
into M2M. |
Post
Forge Supervisor and Forge QC Supervisor |
|
SCARP |
|
Powerway SPC Program
<In part takes the place of Q.C.I.O.s> |
Program used by QC for
dimensional data collection of parts being forged. Includes the inspector,
heat code, forging temperature, cold coining, hardness testing, the shift
parts are made, the hammer used to forge parts, first and last part
inspection, time intervals for data collection, gage, magnaflux, and Post
Production Final Inspection, etc. |
QA Manager |
|
PREQC
NOCON
POSTP
POSQC
HARDT
FTEMP
POSQC
JSTRT
MFLUX
FINIS
SUBCO
STATS
MSURE FTEMP IMPTL HTTRM RMNON |
|
Potential Recall Memo |
Form used to convey the description of a potential problem giving the details as to
who, what, where, when and how. The form is generated by the QA Manager and sent to upper
management informing them of what might be involved in a potential recall of parts from a
customer. The final disposition is also included. |
QA Manager |
10 years |
RCALL |
|
Precision Instrument Manufacturer Info File
|
Folder maintained by Metrologist with suppliers' instructions on how to calibrate
precision measuring equipment. Maintained until equipment is scrapped.
|
Calibrations Clerk |
|
CALIB |
|
Preventive Action Report (PAR) |
E-mailed based document for addressing improvement opportunities (Preventive
Action Reports: PARs), handled similarly to Corrective Action Reports
(CARs). Located in CAR Control File. |
President |
5 years |
CARRR |
| Preventive Maintenance Work Order Log (on computer) |
Ongoing log of PM Work Orders Issued. Maintained in Work Order History file.
|
Warehouse Administrator |
|
PREVM |
| Preventive Maintenance (PM) Work Order |
Hard copy form printed from AMMS to coordinate preventive
maintenance work. Details what needs to be done and when it needs to be done.
Ultimately information printed on form re-entered into AMMS with hard copy discarded.
|
Warehouse Administrator |
5 years within
AMMS, hard copy not retained. |
PREVM |
| Print Follow-up File <on computer> |
Personal computer database maintained by Engineering Assistant for follow-up of prints
sent to customers for approval. |
Engineering Assistant |
|
PRINT |
|
Print Review Spreadsheet
|
Passed between Sales and Engineering whenever a customer cites
a print revision other than that shown in Dies info as current.
|
Engineering Assistant |
20 years |
ORDER |
|
Production Floor Traveler (Traveler) <M2M> (Traveler for all practical purposes)
(Traveler has taken the place of the Next Job ticket and/or Cutting Ticket
) (Traveler for After Run Die Procedures has taken the place of heat code slip)
(Traveler for Post Production) <M2M> |
This
procedure covers the steps of parts being forged in the Forging Dept.
Computer generated packet containing specific job information for a
particular job. "Travels" with job throughout the forging process for
forged parts , through the inspection process and any outside processing by
approved vendors This procedure covers the steps of parts being
machined in the Machine Department. Computer generated packet containing
specific job information for a particular job. "Travels" with the job
throughout the machining process and through the inspection process. A copy
is filed in the Customer PO File. |
Manufacturing Manager
Machining Department Manager |
6 Months
20 years |
FORGE PRDEV
MOPPP
MOPQC
DIMKR
MORDR
MPSMM
JSTRT |
| Production Scheduling
Program <on computer>
(formerly Production Scheduling Board)
|
Personal computer database maintained by
Production Control Scheduler
laying out what job is to
run on what piece of equipment. Used as basis for Production Schedule.
|
Production Scheduler |
|
ORDER
PSCHD |
|
Profitability Spreadsheet |
Complex
Excel spreadsheet to report on job costing of orders run and shipped over a
time period, typically weekly. Master copy is "Profitability MASTER.xlsx",
with copies stored on-line as "Profitability yyyy-mm-dd thru yyyy-mm-dd.xlsx". |
Controller |
5 years |
JCOST |
|
Purchase Order (customer) |
Order
placed by the customer for goods and/or supplies forged and/or machined by
Trinity. |
VP Sales |
|
|
| Purchase Order (PO) for
outside or sub-contract services
Program in <M2M> (formerly Work Order)
|
Purchasing document issued for heat treat, machining, welding, plating or
lab work. |
Production Scheduler |
|
SUBCO |
|
Purchase Order (PO) for die steel or raw
materials Program in <M2M>
|
Raw material purchasing document sent to supplier. Copy stored in
Materials Manager's file by Vendor.
|
Materials
Manager |
5 years |
PURCH
POSUP |
|
Purchase Order Info <on computer>M2M
|
Database on central computer of orders placed for raw material. Data used by multiple
computerized systems.
|
Materials
Manager |
30
years |
PURCH
POSUP |
|
Purchasing Queue |
<on
computer> M2M under Reports -Purchasing Queue -
On Hand by Location Report to check for
having an adequate supply of material that meets the specifications of the
orders unclaimed in the steelyard or already on order |
Materials
Manager |
|
PURCH
POSUP |
|
Purchase Order Supplemental Requirements |
Covers
requirements placed on suppliers for purchased material, goods, or other
services. All
subcontractors and raw material suppliers to Trinity Forge must meet the
requirements. |
Materials
Manager |
|
PURCH
POSUP |
|
QC of the Magnetic Particle Inspection System
|
The
record of the results found during the checking of certain quality control
items involving the magnetic particle inspection equipment. Filed in QC on
line file. |
QA Manager |
10 years |
MFLUX |
| QC
Print |
Contains dimensional information for each job to be inspected with
location of each dimension and tolerances. The print is stored in the
computer and can be viewed and/or printed when needed. |
VP
Quality and Engineering |
|
PRINT |
| Quality
Control Records |
Part
Inspection Sheet, Inspection Remarks Sheet , Mag Particle Inspection Sheet (when req’d),
Cold Coin Inspection Sheet and Final Inspection Report scanned into online
program |
QC
Supervisor |
Last 10
jobs or 3 years |
PREQC PROQC
|
| Quality
Plan |
A formal checksheet of all quality related
functions that apply to a specific part number. Some examples are internal
process requirements, measurement plan (includes inspection criteria, print
review, inspection tool specifics, and production review), testing
requirements, specific vendor requirements, gauging requirements, and
certification requirements. This checksheet will be scanned into an online
directory.
|
QA
Manager |
Last 10
jobs or 3 years |
QARTI |
| Quality Survey |
Document used to
evaluate potential supplier for addition to approved suppliers list.
Filed in the Supplier Approval Files |
QA Manager |
|
SAPVL |
| Quote
Spreadsheet |
Spreadsheet containing directions of what documents there are and how to
find them, with a hyperlink e-mailed to each person whose contribution is
required in the quoting exercise. |
Quote
Estimator |
|
QUOTE |
|
Quote Log
|
Excel spreadsheet
maintained on shared drive to capture Quote Data; due dates for each team
member involved in the quoting exercise, |
VP Sales |
|
QUOTE |
|
Quote Packet
|
Traveling documents involved in the quotation process for a die. Filed in customer
file.
|
VP Sales |
3 years |
QUOTE |
|
Raw Material Nonconformance Report (RMNR)
|
Forms produced when a nonconformance is found in raw material. Stored in
Materials Manager's files by supplier.
|
Materials
Manager |
10 years |
RMNON |
|
Raw Material Receiving Inspection
|
Stamped
on the receiver for each delivery, this lists all steps to inspecting for
acceptance; attached to invoice. |
Materials
Manager |
30
Years |
RECRM |
| Request
for Die Change |
A document, stored on the PC server, which describes a customer's
requirements for a new die or die change of an existing die. |
VP of
Quality and Engineering |
20 years |
DCORD |
|
Reference Specifications Library
|
Collection of reference standards and specifications used
throughout the company. Customer specifications are on line for viewing in the
Specification Directory. Regularly used
standard specifications are added to the on line Specification Directory, all
others are in binders in the QA Office. (Library-any place deemed appropriate to
store or gather specifications).
|
QA
Manager |
|
SPECS |
|
Request for Tooling Work Order
(Formerly Die/Tooling Repair Order) <obsolete> now Work Order
|
Form to report changes needed to forge dies or other tooling for internal work orders.
Routed to Die Shop Leadman.
|
Manufacturing Manager |
|
DSHOP |
|
Resource Request Form
|
Form to process managerial requests for capital, human resource, or miscellaneous
resources. Filed in CEO's files in chronological order.
|
Accounting Manager |
10 year |
RSRCE |
| R&A Spreadsheet
(Obsolete) see Customer Service Request |
Excel spreadsheet
used to track returned parts, reasons for returns, and analysis of
final disposition |
QA Manager |
10 years |
|
| Router |
Detailed instructions used for each step in running a job from beginning to
completion, (production, machining, inspection, outside work performed, and
shipping.) |
VP
Quality and
Engineering |
|
JSTRT FORGE
FINIS |
|
Run Chart <obsolete>
Now Powerway SPC
|
Form tracking basic information of each inspection cycle for
a job, including graphical representation of dimensional readings as
required. Stored on computer in SPC program. |
QC
Supervisor |
10 DSNs, 3 years minimum |
PREQC PROQC
STATS
POSTP |
| Safety
Meeting Agenda |
List of
topics and materials to be used at upcoming Weekly Safety Meetings
distributed by Human resources Manager to all manufacturing supervisors.
Copy retained by HR Manager |
HR
Manager |
3
years |
MEETG |
| Sales
Order |
Electronic information entered in M2M of an order placed by the customer for
goods and/or supplies forged, machined, or fabricated by Trinity Forge. |
Sales
Operation Manager |
3 years |
ORDER |
|
Schedule for TOPs Champion TOPs Review |
Schedule maintained on QA Assistant's computer for TOPs Champions to review their TOPs
. |
QA
Assistant |
|
TOPSM |
|
Scrap Report/Scrap Log
<Maintained in M2M>
|
Report prepared for each job showing how many parts were
scrapped and the cause. Data from the Scrap Report is put in Quality, Production
Inspection in M2M.
|
QA Assistant
|
|
PREQC
NOCON
QDATA
POSQC
SCRAP
|
|
Shift Change Memo/E-mail Forging Division
|
Form or e-mail used to convey information from one shift to the next that might be pertinent in
the company's operation. Stored as needed with recipient's records. |
Shift Supervisor |
|
SHIFT
FINIS |
|
Shift Change Memo/E-mail Machining Department
|
Computer generated form used to convey information from one shift to the next that
might be pertinent in the company's operation. Not retained. |
Shift Supervisor |
|
SHIFT |
|
Shipping List (Replaces Packing List) |
Shipping document similar to invoice sent to customer with shipment. No copy
maintained, but copy of invoice maintained in Customer PO file. |
Production Scheduler |
|
FINIS |
|
Shipping Memo
|
Form detailing what is to be shipped, including packaging and transportation
information, as well as weights and counts by container. Stored in Accounts Receivable
Clerks file.
|
Production Scheduler |
20 Years |
FINIS |
| Shop
Schedule |
In the
shared drive as s:\schedule/shopscheduleall consisting of a list of all jobs
and work centers. |
|
|
|
|
SOsOnOrder.xls |
Spreadsheet for made to order sales orders found in the shared file. |
Sales
Operations Manager |
|
ORDUE |
|
Specification Library (on line) |
Directory for storing on line all Customer Specifications and regularly used
standard specifications. |
QA
Manager |
|
SPECS |
| Spec ID |
The
system for translating customer specifications into Trinity specifications.
This data is used throughout M2M. |
VP
Engineering and Quality |
|
TPSMM
|
|
Specification Review Spreadsheet <Specification
Revision Review Slip SRRS> old |
Electronic spreadsheet
used by Sales, QA and Engineering team members whenever a customer cites a
specification revision. Stored on line. Engineering Assistant monitors the
Specification Review Spreadsheet daily, sends out the automated report on
Tuesday and Friday as a minimum.
|
VP
Engineering and Quality |
20 years |
TPSMM
ORDER
SPECS
|
| SPC
Data Format (Powerway SPC Program) |
Computer generated system for collecting and
recording inspection data during forging and machining process. |
QA
Manager |
|
MOPQC |
| Strategic
Plan, Corporate |
Formal report
generated by the CEO which sets overall corporate goals. Paper copy
maintained as a record in Management Review File |
President |
5 Years |
MREVU |
|
Steel Info <on computer>
|
The central computer database system for raw material. Data from this database is used
throughout the computerized systems.
|
Steelyard Lead Man |
30
years |
CUTIT
CYCLE
RECRM |
|
Steelyard Scrap Log |
Form
filled out by the Steelyard Workers for scrap count and scanned
into M2M. The Steelyard Scrap Log is forwarded to the Materials Clerk for
scrap causes to be entered in M2M. |
Steelyard Supervisor |
|
SCRAP |
| Steel
Stickers |
Stickers placed on the bundle tags with the lot number, size, grade, heat
code, weight, and vendor. |
Materials Manager |
|
RECRM |
|
Steelyard Cycle Count Schedule |
Calendar containing schedule of steelyard bins and corresponding cycle count
due dates (S:\ACCTNG\INVENTORY COUNTS\SteelyardCycleCount.xls) |
Controller |
3 years |
CYCLE |
|
Steelyard Cycle Count Form |
Blank form
used to record Steelyard cycle count information. Included in the (S:\ACCTNG\INVENTORY
COUNTS\SteelyardCycleCount.xls) |
Controller |
3 years |
CYCLE |
|
Steelyard Daily Scale
Checklist |
Form
used to record daily the scale weights for the box/crane. |
Steelyard Supervisor |
1 month |
RECRM |
|
Steelyard Inventory Report |
Excel
spreadsheet report, links to M2M. Contains steelyard info by Bundle ID &
Bin; included in (S:\ACCTNG\INVENTORY
COUNTS\SteelyardCycleCount.xls) |
Controller |
3 years |
CYCLE |
| Steelyard Clipboard |
Clipboard that holds the "Traveler
and/or BOM" in the
Steelyard office to hold heat code and heat code changes for jobs
waiting to be run. |
Steelyard Supervisor |
|
CUTIT |
|
Steelyard Cutting Sheet |
Form
used by the steelyard to log the cutting of raw material. Travels with
Billet Traveler |
Steelyard Supervisor |
2 years |
CUTIT |
|
Steelyard Traveler (Traveler in M2M has taken the place of the
Next Job ticket and/or Cutting Ticket ) |
Form
specifying what raw material is to be cut in what quantities and to what
dimensions for a job. |
Materials
Manager |
2 years |
CUTIT
JSTRT PSCHD |
|
Stocking Program in <M2M>
(was Consignment Purchase
Order) |
Document used to order
items for the tool crib from vendor following routine purchasing procedures |
Machining Department Manager |
30
years |
MCRIB |
|
Supplier Approval File (supplier folder) |
File maintained by
QA Manager with details of supplier evaluation and approval. In
supplier/chronological sequence.
|
QA Manager |
10 years |
SAPVL |
|
Supplier Info <on computer>
|
The central computer database system for suppliers and subcontractors. The supplier
notes section includes supplier evaluation and re-evaluation information. Data from this
database is used throughout the computerized systems. |
QA Manager |
20 years |
SAPVL |
|
Synchronizer Gantt
Chart |
Shop Schedule in M2M. |
Production Scheduler |
|
|
| Tax
Exempt Certificate |
Certificate for the purchase of tangible personal property
or taxable services for resale or for use in performing taxable services
where such property becomes a component part of the property upon which the
services are performed and will be actually transferred to the purchaser. WV
Code § 11-15-9(a)(9)
An Exemption Certificate may be used only to claim exemption
from tax upon a purchase of tangible personal property or services which
will be used for an exempt purpose.
A purchaser may file a blanket Exemption Certificate with
the vendor to cover additional purchases of the same general type of
property or service. However, each subsequent sales slip or purchase invoice
evidencing a transaction covered by a blanket Exemption Certificate must
show the purchaser’s name, address and Business Registration Certificate
Number for purposes of certification.
|
Controller |
|
NEWDI |
|
Tags and Labels
|
Various types of metal and paper tags and stick-on labels are used throughout forging
and/or machining process. Green tags for "Ready to Ship", yellow tags for
"MPI Test" and red tags for "Rework".
|
Steelyard Lead Man, QC Supervisor, Post Forge Leadman, Machining Department Supervisor |
|
Used throughout |
|
Team Member Training File
|
Folder for each team member showing individual's training or plans. Used in conjunction
with training modules and training attendance sheets. Filed in Personnel office Training
files in alphabetical order. |
Training Coordinator |
Lifetime of employment plus 10 years |
TRECS |
| Technique Sheet |
Instructions on how to perform magnetic particle inspection for a specific part.
The Technique Sheet is kept on the server (S:\POST FORGE\Technique Sheet .xls) |
Post
Forge Supervisor |
|
MFLUX |
|
3D Die Design Checksheet |
Form
used to show Engineering die design intent and then approval of same for 3D
die designs. Stored
in Engineering files. |
VP
Quality & Engineering |
10
years |
CASTS DIMKR
SOLID |
|
13WeekOutlook.xls |
Spreadsheet for a 13 week analysis of sales $ to ship on Sales Orders and to
move into inventory-consigned items not included. |
Sales
Operation Manger |
|
ORDUE |
|
Time Cards/Sheet
|
Cards/Sheet filled out for non-exempt team members to record the hours worked
daily/per week. Reconciled at the end of each pay period by Supervisors
and submitted to Payroll Clerk. Stored in Accounting. |
Payroll Clerk |
5 years |
|
| TFQM
Archive |
Paper
copy of Trinity Forge Quality Manual, with CD-ROM of contemporaneous TOPs
system, retained for archive purposes in Controller's file safe (file
initiated 11/01/2006) |
|
20
years |
TFQMM |
| TFQM Update
Notification List |
List maintained in
Audit Manager's personal email directory of customers needing notification
of Quality Manual changes.” |
Audit Manager |
|
TFQMM |
|
TFQM Release File
|
Release and distribution information regarding Trinity Forge Quality Manual. Maintained
in Audit Manager's email file.. |
Audit Manager |
10 years |
TFQMM DOCUM |
|
TFTP Release File
|
Release and distribution information regarding Trinity Forge Team Positions. Maintained
in Computer. |
Training Coordinator |
10 years |
TFQMM DOCUM |
|
Tooling Cutting Ticket
|
Document detailing what needs to be done and what has been done for die preparation.
Filed in Engineering files.
|
Engineer |
10 years |
DSCON |
|
Tooling Info <on computer>
|
The primary central computer database system for tracking the materials needed for the
forging process. Data from this database is used throughout the computerized systems. |
Engineering Assistant |
|
FTEMP |
|
Tooling Job Order <on computer>
|
Purchasing document issued for dies or other tooling and for other die related
accessories. Located in the Tooling program.
|
Die
Shop Supervisor |
5 years |
SINKR
PATRN |
| Tool
Crib Inventory Report |
Form
used to record physical inventory counts. |
Accounting Manager |
|
MCRIB |
|
TOP Release File
|
Release and distribution information regarding Trinity Operating Procedures. Maintained
on computer.
|
Tops
Clerk |
5 Years |
TOPSM
DOCUM |
|
TOP Violation Notification Form
|
Form used to record an employee's violation of specific TOP procedures. Filed in
employees personnel file.
|
HR Manager |
Lifetime employment plus 10 years |
ENFRC |
|
Training Record
|
Records of each person who has received each unit of instruction in the training program.
Copy stored chronologically in Team Member Training File for each trainee. Contains information for how training was later deemed "effective"
|
Training Coordinator
|
Lifetime employment plus 10 years |
TRECS |
|
Training Requirement Checklist |
Form
used by the Training Coordinator to record employee name, number, team
position and modules completed with completion dates. |
Training Coordinator |
Lifetime employment plus 10 years |
TRECS |
|
Traveler for After Run Die Procedures (Traveler in M2M
has taken the place of heat code slip) |
This
procedure covers the steps followed with the dies and other tooling after a
forging job is complete. |
Die
Shop Supervisor |
|
AFTFG |
| Trinity
Forge General Hardness Chart |
Chart
with lot size, sample size, defects accepted and defects rejected. |
QA
Manager |
|
TREAT |
| Trinity Forge Environmental
Management System Manual |
Highest level
document of Trinity Forge Environmental Management System. Has
formal control procedures. Maintained on the Internet at http://www.trinityforge.net/enviromanual.htm
|
Environmental
Coordinator |
10 Years |
TFEMS
|
|
Trinity Forge Quality Manual (TFQM)
|
Highest level document of Trinity Forge Quality System. Has formal control procedures.
Maintained on the Internet at http://www.trinityforge.net/qualitymanual.htm
|
QA
Manager |
10 years |
TFQMM |
|
Trinity Forge Team Positions (TFTPs)
|
Documents detailing the responsibilities and requirements of each position on the
Trinity Forge team. Has formal control procedures. TFTPs are available on-line.
|
Training Coordinator |
10 years |
TFTPM DOCUM |
|
Trinity Forge Training Modules (TFTMs) <on computer>
|
Documents detailing each "course of study" in the training program. Has
formal control procedures. TFTMs are available on-line. Masters are kept in
personal computer files. |
Training Coordinator
|
10 Years |
TFTMM DOCUM |
| Trinity Operating Procedures
(TOPs) |
Hypertext manual of written procedures covering the various aspects of Trinity Forge's
operation (this document). Has formal control procedures. Indexed with appendices to help
locate specific TOPs
|
President |
10 Years |
TOPSM |
|
Trinity Procedure Specifications (TPS) <on computer> <Replaced by M2M>
|
The primary central computer database system for translating customer specifications
into Trinity specifications. Data from this database is used throughout the computerized
systems. |
VP Quality & Engineering |
On computer |
TPSMM |
|
Urgent Release Form
|
Form submitted by steelyard personnel whenever material must be cut before all
specifications of the raw material (typically receipt of mill test results) have been met.
Stored in Certs files in computer program in heat code sequence. |
Materials
Manager |
3 year |
URGNT |
| Vendor
Rating Form |
Form
printed with Approved Vendor List used to rate the quality of vendors.
|
QA
Assistant |
|
DOCUM |
| Viewer
File |
File
that has been created with the Imaging System in order to view prints |
VP Quality & Engineering |
20
Years |
PRINT
CADFL |
|
Viewer Approved Folder |
Folder where the approved
cad/cam file image resides prior to placement in the viewer database. |
VP Quality & Engineering |
|
PRINT
CADFL |
|
Viewer Unapproved Folder
|
Folder where the
unapproved cad/cam file image resides, while waiting approval (usually from
the customer) prior to placement in the Viewer Approved Folder.
|
VP Quality & Engineering
|
|
PRINT
CADFL |
| Weld
Log <Assembly Log> |
Process
Log used to record heat codes, serial numbers, welding material, and
customer specification also used to acknowledge parts have been inspected and
recorded. A copy is retained in customer file with certifications. |
Machining Department Manager |
20
years |
MORDR MOPQC |
|
Witness Statement
|
Statement taken from an employee who witnessed an on-the-job accident by a co-worker.
|
HR Manager |
6 years |
ACDNT |
|
Work Order Info <on computer> now "M2M"
|
The central computer database system for subcontractor work orders. Part of the
Inventory/Order entry system. Data from this database is used throughout the computerized
systems. |
Production Scheduler
|
|
SUBCO |