REV: 06/11/07
SCOPE: This procedure covers in-house die and trimmer
make-ready and/or repairs. It is divided into three sections, any of which may pertain to
a given situation.
| STEP |
WHO |
WHEN |
INFO TO
USE |
WHAT TO DO |
RESULTS |
| 1 |
Anyone in Die Shop |
New die arrives from
die sinker |
Dies, tooling, print, die layout |
Fully inspect die
and related tooling, note any deviations on the Die Improvement Sheet. Send
Die Improvement Sheet to engineering. |
Die and tooling inspected |
| 2 |
Die Shop
Supervisor, Die Shop Leadman, Engineer, Die Man |
After die received by
Die Man |
Personal observation, approved
forging print or die layout |
Visually inspect die; mark up
areas that need to be modified to match print; (or) verbally give instructions for changes
to Die Shop Leadman; Make sure any
requested changes are added to Die Improvement Sheet |
Die visually inspected for
improvements, marked up die or verbal instructions to Die Shop Leadman |
| 3 |
Die Shop
Leadman or Die Man |
Upon instructions
from person inspecting die |
Marked up die; instructions from
person inspecting die; possibly marked up part or die print |
Make changes to die as instructed
and prepare to add stamping |
New die now ready; stamping
needed |
| 4 |
Die Shop Leadman or Die Man |
As die is ready for
stamping |
Approved forging print |
Stamp die according to approved
forging print |
Die stamped |
| 5 |
Die Shop Leadman, Die Man or QC Inspector |
After die stamped |
Approved forging print |
Visually inspect die stamping |
Die properly stamped |
| 6 |
Die Shop Supervisor |
Die is ready for
production |
Visual inspection, Die Man or Die Shop Leadman approval |
Change Job Order to closed in M2M. |
Job
Order closed |
REWORK DIES/TRIM TOOLING (IN DIE SHOP) |
| 1 |
Any manager,
typically Production Leadman, QC
Inspector, hammerman or Die Shop Supervisor,
Production Supervisor |
Upon determining need
for forge die/ tooling repair |
Visual observation,
info from hammerman, Quality Control department, own judgment;
Job Order |
Mark up areas to be
modified or repaired (or) verbal instructions to Die Shop Leadman (or)
initiate Job Order |
Need for repair determined;
instructions to Die Shop Leadman or Die Man; Job
Order initiated or
requested |
| 2 |
Die Shop Leadman, or
Die Man |
Upon receipt of
repair instructions |
Marked up
die/tooling; verbal info; Job Order |
Make repairs/changes to
die/tooling as instructed |
Die/tooling repaired as
instructed |
| 3 |
Die Shop Leadman, or
Die Man |
Upon receipt of
die/tooling |
Die Improvement Slip; own
judgment |
If repair affects future die
sinks, complete Die Improvement Sheet, giving full details of changes made; (see TOP-IMPTL ) |
Completed Die Improvement Sheet
filed for future re-sinks |
| 4 |
Die Shop Leadman, or
Die Man |
Repairs complete |
Personal observation,
notification from Die Shop Leadman |
Notify Production Leadman or
Production Supervisor die/tooling is repaired and ready for use |
Die/tooling ready for production |
REWORK DIES/TRIM TOOLING (IN PRODUCTION AREA) |
|
1 |
Die Shop Supervisor or Leadman, QC Inspector, or hammerman |
Upon
determination of need for die/tooling repair |
Visual observation, info from hammerman, Quality Control Dept., own judgment |
Give
verbal instructions to Die Shop Leadman, Die Man or Die Trimmer Man for
repair |
Need
for repair determined; instructions to Die Shop Leadman, Die Man or Die
Trimmer Man |
| 2 |
Die Man or Die
Trimmer Man |
Upon receipt of repair
instructions |
Verbal information |
Make repairs/changes to
die/tooling as instructed; If this is a change that effects a resink
change, make Die
Improvement Sheet and turn in to
Engineering. |
Die/tooling repaired as