SCOPE: This procedure covers the "special process" of in-house Non-Destructive Testing, sometimes referred to as "Magnaflux Testing".

STEP WHO WHEN INFO TO USE WHAT TO DO RESULTS
1 QC Supervisor/QC Inspector Upon verifying and determining a need for Magnetic Particle Inspection (MPI) testing or per customer's request Personal observation; Customer Specifications; Traveler Verify Magnetic Particle Inspection is required, and place a Yellow Tag labeled "Ready for Magnetic Particle Inspection" inside container; take parts to staging area in Post Forge; notify Post Forge Supervisor or Post Forge Leadman of need for Magnetic Particle Inspection; if traveler does not have Magnetic Particle Inspection step have QC Supervisor or Post Forge Supervisor add step as required. Parts tagged with a Yellow Tag; Post Forge Supervisor/Leadman notified; Magnetic Particle Inspection step added to Traveler if not already there.
2 Post Forge Supervisor/Leadman Upon notification that parts need Magnetic Particle Inspection Tagged parts; Customer Specifications, Traveler Add Magnetic Particle Inspection steps to traveler if required; schedule parts to be inspected. NDT Level II notified that job scheduled for Magnetic Particle Inspection scheduled and noted on Traveler.
3 NDT Level ll Upon notification that parts need Magnetic Particle Inspection The part's identity, use, material, photo, print or actual part; Customer Specifications (if present); earlier Technique Sheet (if present) Verify that there is a Technique Sheet available; if there is not a Technique Sheet for the job, develop a Technique Sheet based on latest revision of ASTM E 1444, Traveler information or Customer Specifications; submit Technique Sheet to NDT Level III; if a Technique Sheet exists continue with the inspection process. Technique Sheet developed if required or Technique Sheet assigned; inspection scheduled and noted on Traveler
4 NDT Level III Upon receiving Technique Sheet Technique Sheet; personal knowledge Review Technique Sheet for completion; make any needed corrections, sign approval; forward to QA Manager. Technique Sheet reviewed, corrections made; approval made; forwarded to QA Manager.
5 QA Manager Upon receiving Technique Sheet Technique Sheet Scan Technique Sheet into system. Technique Sheet scanned.
6 NDT Level II When inspection of parts is scheduled Traveler; Technique Sheet; Customer Specifications (if present); Trinity Forge Non Destructive Testing Specification Conduct examination per Technique Sheet, looking for relevant indications (unless specified differently by the customer's specification or Traveler none of the following will be acceptable: any relevant indication 3/16" or longer, no more than 10 relevant indications in any 6 sq. in. area, four or more relevant indications in a line separated by 1/16" or less edge to edge, no relevant indications in pressure contact sealing surfaces); taking any questions to NDT Level III; fill out Magnetic Particle Inspection Log; if Traveler requires examination to be certified, work with QA Manager to fill out NDT Certification Form then sign it and forward to QA Manager. Inspection completed and scanned into Magnaflux scan file; parts inspected and results recorded on Magnetic Particle Inspection Log; if certification is required Non Destructive Certifications completed and forwarded to QA Manager.
7 NDT Level I or NDT Level II Inspector, QC Supervisor When parts are inspected and found to need rework Red Tag for rework of parts; Green Tag for parts ready to ship Mark parts to show location of indications that they need rework; place parts in bin marked with Red Tag for rework; place good parts in bin with ready to ship Green Tag; when all parts are good continue with Production Floor Traveler steps.

QC Supervisor to make a sample of rework part, tag it as sample part and place in rework bin for Post Forge Helper to use as sample for conducting rework.

NOTE: Be extremely careful not to mix rework parts with good parts.

Parts marked with location of indications that rework is needed, placed in bin labeled with rework Red Tag; sample part for rework placed in rework bin; good parts placed in bin labeled with ready to ship Green Tag.
8 Post Forge Helper Upon receiving parts from Magnetic Particle Inspection labeled with rework Red Tag Sample rework part labeled by QC Supervisor, bin with parts marked with rework Red Tag Rework parts in accordance with sample part; place rework parts in new parts bin labeled with ready for Magnetic Particle Inspection Yellow Tag; continue with process until all indications are completely reworked; if deemed scrap fill out Scrap Report and enter in M2M. Parts reworked and tagged; Scrap Report filled out; scrap entered in M2M.
9 QA Manager Upon receipt of completed NDT Certification NDT Certification Verify that the certification has been completed per this TOP; e-mail Post Forge Supervisor that the NDT Certification has been reviewed and approved; issue certification to customer per TOP-ORDER and file NDT Certification traceability copy on server. Post Forge Supervisor notified that NDT Certification was approved; NDT Certification submitted to customer with copy on server for traceability purposes.

For information on a document or record, including definition, primary responsibility and retention, refer to the Document and Record Master List.


See an uncontrolled translation of this page in the language of your choice:

Search this web site or the entire web:

Google
Search WWW Search www.trinityforge.net

Documents are controlled only when viewed on-line in the original English -- printed copies or translations are not controlled documents.
© 2008 Trinity Forge, Inc., +1 817-473-1515