| STEP |
WHO |
WHEN |
INFO TO USE |
WHAT TO DO |
RESULTS |
|
1
|
QC Specialist or QC Inspector
II |
During forging; as job begins to
run (this includes a new crew moving to a
different hammer since the QC Inspector II moves
with one or more crews, rather than being
assigned a specific hammer); or as significant
changes are made to die or process; at least one
per shift for each hammer |
Contents of QC inspection
folder; steel buggy/tub tag, blue prints;
Production Floor Traveler |
Help crew determine match for
initial setup; check heat code on part against
heat code slip and tag on steel buggy or tub;
record hand-held pyrometer readings on the Part
Inspection Sheet along with date, time and
Inspector stamp; if reading outside of forging
temperature guidelines or Jobs Info (see TOP-FTEMP),
report immediately to Production Supervisor; take
first production part from each die impression to
perform a hot inspection; if the part(s) fail hot
inspection, that part and any part made after that
fails will be scrapped at the hammer and recorded
in the Hammer Scrap Log; after an acceptable part
is made it will be quickly cooled and cleaned;
perform part inspection by checking all critical
dimensions of the part(s) and record them on the
Part Inspection Sheet and in SPC Data Format; if
there is a change of process, production
equipment, blow pattern or tooling, or any
discrepancy visually or dimensionally,notify
assigned Engineer via e-mail, document the change
or discrepancy by stating the problem and cause
with proposed plan of actinon on the inspection
remarks sheet; after the change is made,
immediately re-inspect and document the
resolution regarding changes, discrepancies,
and/or failures on the Part Inspection Sheet; any
change in temperature or blow pattern must be
noted on the Hot Cell Sheet and on the Traveler;
initial or stamp with employee stamp per TOP-QARTI;
(note: forging does NOT stop for inspection
unless so ordered); IF INSPECTION FAILS, REPORT
IMMEDIATELY TO THE QC
SUPERVISOR and
PRODUCTION SUPERVISOR; when the
hammer is down note in the “COMMENTS”
section in SPC Data Format such
conditions that prevents the recording of
inspection data. |
Job begun with temperature, match and
lettering approved; Part Inspection Sheet
completed and results entered in SPC Data
Format; Engineer notified via e-mail of any
changes |
|
2
|
Production
Supervisor or Leadman
|
During forging; (typically every 30
minutes) |
Own judgment; verbal information provided by
Quality Control; steel buggy/tub tag; Production
Floor Traveler |
Perform hot inspection of sample parts being
produced (looking for problems of match,
lettering, scale, fill, shuts, trim and hot
gauging; confirm heat code and stamping; resolve
any problems encountered; if special tagging or
inspection is needed (for example, if there is
the possibility that parts will need rework) tell
the QC Inspector III or QC
Specialist. |
At hammer QC duties
performed |
|
3 |
Hammerman |
Before each heat break (typically every 30
minutes) |
Personal knowledge |
Check forgings just made for fill, scale,
match and obvious chops; notify QC Inspector III
of any problems, so bad or questionable parts are
tagged; record scrap on Hammer Scrap Log; initial
hammer log. |
Forgings checked for fill, scale, match and
obvious chops; QC Inspector III notified of any
problems; scrap recorded on Hammer Scrap Log;
hammer log initialed that this was
done |
|
4 |
QC Inspector II |
During forging; once each "inspection
cycle" (typically every 30
minutes) |
Contents of QC inspection folder; Production
Floor Traveler; heat code slip, steel buggy/ tub
tag, blue print, Hotcell |
Verify heat codes; tag parts containers not
being initialed by originator and move to cooling
/cleaning area;verify Hotcell and Traveler is
being strictly followed; REPORT ANY PROBLEM OR
QUESTION TO THE QC SPECIALIST; during the forging
process if there are any authorized changes to
the parts or process the changes will be
documented and a sample part will be re-inspected
to see if the parts are adversely
affected. |
At-hammer
duties, especially hot inspection, performed on
schedule, parts ready for cleaning per TOP-BLAST
|
|
5 |
QC Inspector II |
During forging, each "inspection
cycle" (typically every 30 minutes): as
parts are cooled then clean |
Contents of QC inspection folder, tags on
parts containers, blue print(s); Production Floor
Traveler |
Inspect (and gage if required) sample parts
for visible defects unless the Production Floor
Traveler specifies some other scheme; keep
containers tagged; record date, time, and
inspector stamp, measure and chart any dimensions
required; enter date and record all problems and
decisions regarding corrective action (Note that
a minimum of one part per die impression is to be
inspected each cycle and recorded in the SPC Data
Format; REPORT ANY PROBLEM OR QUESTION TO THE QC
SPECIALIST OR QC SUPERVISOR (if the QC Specialist
is unavailable and you believe that bad parts are
being produced, perform the QC Specialist
reporting responsibilities per step 6); tag and
move bad or questionable parts to re-inspection
table or other place designated by the QC
Supervisor;note that in this step "problems
include any out-of -tolerance reading, any delay
cleaning parts for inspection, any recurring
reason that parts are being scrapped; any concern
the QC Inspector may have about the process being
out of control, or any concern that defective
parts may have escaped detection; inspector
discovering flaws must complete the HOLD tag
including the die number, heat code and a brief
description of flaw, disposition parts per
TOP-NOCON;
ensure parts scrapped at the hammer are recorded
by the hammerman on the Hammer Scrap Log per
TOP-SCRAP. |
Ongoing completion of SPC Data Format; bad
and questionable parts separated out; flaw noted
on HOLD tag; tag removed and destroyed after
completion of inspection; scrap at the hammer
recorded on Hammer Scrap Log |
|
6
|
QC Specialist or QC Inspector
II |
Upon believing that defective or
nonconforming forgings are being
produced |
Own judgment and maybe others'
ideas |
Double check available data to ensure that
you do believe bad parts are being produced; if
so, report to Production Supervisor or Leadman
for correction; if problem persists and
production is not stopped, you must continue to
report your concerns to higher levels of
management until the problem is solved,
production is discontinued or you are presented
with evidence that convinces you that the parts
being produced are good ("it's okay
because I'm the boss and I say it is")
is by no means acceptable; the managers or
supervisors to whom you report the problem must
sign the Production Floor Traveler if they want
to continue to run parts after they are advised
the parts have problem (s);it is the
manager/supervisor's responsibility to make
sure the Production Floor Traveler is
signed;failure to do this will be considered a
major violation of this TOP; if a
manager/supervisor will not sign for a problem,
the job is to be shut down immediately; report
the problem to the QC
Supervisor. |
Parts only run while QC and management are
satisfied with quality |
|
Note: Neither QC Inspectors nor QC
Specialists are authorized to stop production,
but all other positions cited in this step
(Leadman to President) are so
authorized.
|
|
7
|
QC Specialist or QC Inspector
III |
After a job is completed at the forging
level |
Production Floor Traveler; in process
dimensions; visual inspection |
Perform
last part inspection and document
in SPC Data Format; any
last part that is saved will be recorded on the
Final Inspection Report as scrap and recorded
on the Post Forge Scrap Log and scanned into
M2M; place completed QC folder and Production
Floor Traveler in rack for further processing
by Post Forge per TOP-BLAST.
When
dies or tooling exhibit excessive wear, visual
or dimensional problems fill out an Internal
Process Review Form; forward to QC
Supervisor.
|
Last
part inspection complete; any problems found
during forging are communicated as the job
moves through Post Forge; scrap recorded on the
Post Forge Scrap Log
Internal Process Review Form forwarded to
QC Supervisor.
|
|
8
|
QC Supervisor |
When an Internal Process Review Form is
turned in |
Internal Process Review
Form |
Review Internal Process Review Form;
Disposition parts; fill out QC Supervisor's
part of form; forward to Engineering
Assistant. |
Internal Process Review Form reviewed; parts
dispositioned; form forwarded to Engineer for
die/tooling review |
|
9 |
Engineering Assistant |
Upon receiving Internal Process Review
Form |
Internal Process Review Form; Quality Control
Data; Production emails; Die review
information |
Review Internal Process Review Form; add job
die/tooling information; forward to the Engineer
assigned to customer for die/tooling
review. |
Job die/tooling information added; form
forwarded to assigned
Engineer. |
|
10 |
Engineer |
Upon receiving Internal Process Review
Form |
Internal Process Review
Form |
Review Internal Process Review Form;
determine if any changes are required to
die/tooling; forward back to Engineering
Assistant for processing and
scanning. |
Internal Process Review Form reviewed;
completed form forwarded to Engineering
Assistant. |
|
11 |
Engineering Assistant |
Upon receiving completed Internal Process
Review Form |
Internal Process Review
Form |
Review Internal Process Review form for any
action required; enter die/tooling job
requirements into M2M Standard Router or Item
Master as required; scan document into
system. |
Die/tooling job information entered; Internal
Process Review Form scanned into
system. |