Trinity Forge, Inc.Go to Trinity Forge Home


TOP-RECOM: Receiving "Other" Raw Materials

REV:07/16/10
SCOPE: This procedure covers steps involved in receiving raw materials other than the primary raw materials of steel and other metals used for forging and machining.
STEP WHO WHEN INFO TO USE WHAT TO DO RESULTS
1 Anyone receiving bolts, paint, springs, pins, weld consumables, customer supplied tooling, or "other" raw materials that are to be used as part of the finished product Upon receipt of bolts, paint, springs, pins, weld consumables, customer supplied tooling or "other" raw materials Accompanying paperwork; visual inspection Notify Machine Department Buyer of bolts, springs and pins; Warehouseman of paint; Materials Buyer of weld consumables; Machine Department Buyer of "other" raw materials; Machining Clerk of customer supplied tooling via phone, e-mail or personal contact; keep all accompanying paperwork together with the item unless directed otherwise by Crib Attendant or Warehouseman; sign packing list Item initially identified; Crib Attendant, Warehouseman, Materials Buyer, Machining Clerk or Machine Department Buyer notified of its existence and location; packing list signed
2 Warehouseman, Materials Buyer, or Machine Department Buyer Upon being notified that bolts, paint, spring, pins, weld consumables or "other" raw materials have arrived for use on finished product Information obtained during notification; visual inspection of item and/or paperwork; contact with supplier; Purchase Order Match item to Purchase Order; direct item to proper receiving/ inspection area along with accompanying paperwork; update Purchase Order to partial or complete status Item matched with Purchase Order and PO Status updated; item sent to proper receiving/ inspection area
3 Anyone receiving Primary, Critical, Flight Safety parts, assemblies, or customer supplied material Upon receipt Primary, Critical, Flight Safety parts, assemblies, or customer supplied material Accompanying material certs; Production Floor Traveler; own knowledge Notify Machine Department Manager of the need to inspect and classify the incoming Primary, Critical, Flight Safety parts, assemblies, or customer supplied materials. Material received; Machine Department Manager notified of need for inspection and classification of materials
4 Machine Department Manager Notification of need for inspection of materials received Accompanying material certs; Production Floor Traveler; own knowledge Inspect and verify material and classify as Primary, Critical, Flight Safety ; have material moved to designated area according to classification and received per TOP-MOPPP. Material inspected, verified, classified and moved to designated area
NOTE: STEPS 5 THROUGH 12 ARE BROKEN OUT FOR THE SPECIFIC "OTHER" MATERIALS WE RECEIVE. REFER ANY NOT LISTED TO MACHINE DIVISION BUYER
5 Material Handler Upon receiving springs for use on gate valve assemblies Accompanying paperwork; part drawing Check at least ten springs from each container for: dimensional and geometric compliance; perform visual inspection for pits, rust and cracks; check for discoloration (should be bright, silvery and shiny); verify the reported certifications are within the material specifications; forward certifications to Machine Department Buyer; enter into Other Raw Material Inventory System unless problems are found; if problems are found, initiate Raw Material Non-conformance Procedure (TOP-RMNON); put springs in storage unless there is a problem Springs checked for compliance; certifications forwarded to Machine Department Buyer; problems reported
6 Machine Department Buyer Upon receiving certifications for springs, for use on gate valve assemblies Certifications File certification Evidence of quality product retained
7 Material Handler Upon receiving pins for use on gate valve assemblies Accompanying paperwork; Purchase Order Check at least ten pins from each container for dimensional compliance, pits, rust and cracks; if problems are found, initiate Raw Material Non-conformance Procedure (TOP-RMNON) put pins in storage unless there is a problem Pins checked for compliance; problems reported; entered in Other Raw Material Inventory System; stored if no problem
8 Crib Attendant/ Machine Department Buyer Upon receiving bolts for use on tamping tools Accompanying paperwork; Purchase Order Match container label with Purchase Order; check at least ten bolts from each container to verify that they fit the tamping tool (if available) while doing a visual inspection for cracks; enter into Other Raw Material Inventory System unless problems are found; if problems are found, initiate Raw Material Non-conformance Procedure (TOP-RMNON); put bolts in storage unless there is a problem Bolts checked for compliance; problems reported; entered in Other Raw Material Inventory System stored if no problem
9 Machine Department Buyer Upon being notified that a "new" raw material has been received that does not already have existing receiving inspection criteria Purchase Order; applicable prints, specs, etc. Develop receiving inspection instructions; ensure material is properly inspected, identified and stored; add to this TOP (per TOP-TOPSM) if this material will be purchased on continuing basis Receiving inspection instructions developed; material properly inspected, identified and stored; add to this TOP if material will be purchased on continuing basis
10 Welder Upon receiving weld consumables for use on product Accompanying paperwork, Purchase Order Verify correct material received and is in compliance; forward material certifications to Materials Manager; store consumables in dry metal cabinet for protection from moisture and UV light. Weld consumables verified for compliance; problems reported; material traceability maintained; weld consumables preserved and stored
11 Materials Manager Upon receipt of materials certifications Accompanying paperwork; Purchase Order Have material certifications scanned for traceability retention. Certifications stored in archives for minimum retention then destroyed (per TOP-DOCUM). Evidence of quality product retained
12 Materials Handler Upon receipt of customer supplied tooling or fixtures Accompanying paperwork; Purchase Order Forward customer packing list or shipping authority to Machining Clerk to be filed as evidence of receipt of customer supplied tooling and/or fixtures.. Evidence of customer supplied tooling and/or fixtures filed in customer file
NOTE: STEPS 13 THROUGH 17 ARE BROKEN OUT FOR THE SPECIFIC "SHELF LIFE" MATERIALS WE RECEIVE. REFER ANY NOT LISTED TO MACHINE DIVISION BUYER
13 Material Handler Upon receiving shelf life materials used for assembly of parts Received material; accompanying paperwork; applicable specifications Route material to Machine Shop Manager or QC Supervisor for labeling and storage. Material delivered to proper personnel in Machine Shop
14 Machine Shop Manager, QC Supervisor Upon receiving shelf life materials Received material; accompanying paperwork; Certification if required; applicable specifications Identify material with label specifying date received and shelf life expiration date per applicable specifications and requirements; Material stored in proper location as required by applicable specifications and material label; Route paperwork and certifications (if required) to Calibrations Clerk for entry into Gage Control System for tracking and filing. Material labeled properly; Material placed in proper storage location; paperwork forwarded for entry into Gage Control System and filing
15 Calibrations clerk Upon receiving shelf life material paperwork or certifications Material paperwork and certification if required Enter material received into the Gage Control System for tracking purposes; Scan paperwork to put into material file in Gage Control System; Enter shelf life expiration date to notify when the material has reached its shelf life date; When notified that the material has reached its shelf life through the system, notify the Machine Shop Manager or QC Supervisor to dispose of material; Verify that the material has been disposed of. Material entered into Gage Control System; Documents scanned into system; When required notified Machine Shop Manager and QC Supervisor material has reached it's shelf life.
16 Anyone Upon use of shelf life material Material and material label Verify material is within shelf life dates prior to use; if material is out of date notify Machine Shop Manager and QC Supervisor: DO NOT USE MATERIAL BEYOND SHELF LIFE Material verified; Machine Shop Manager/QC Supervisor notified if required
17 Machine Shop Manager, QC Supervisor Upon notification that material is beyond shelf life Material and material label Ensure material is disposed of properly and have new material ordered if required. Material disposed of; new material ordered if required

For information on a document or record, including definition, primary responsibility and retention, refer to the Document and Record Master List.


See an uncontrolled translation of this page in the language of your choice:

Search this web site or the entire web:

Google
Search WWW Search www.trinityforge.net

Documents are controlled only when viewed on-line in the original English -- printed copies or translations are not controlled documents.
© 2008 Trinity Forge, Inc., +1 817-473-1515