TOP-TOOLT:Identification & Storage of Tooling

REV:03/11/08

SCOPE: This procedure covers the marking and placement of forging dies and other die-specific tooling so that it can be easily located and identified.

STEP

WHO

WHEN

INFO TO USE

WHAT TO DO

RESULTS

1 Die Shop, Die Prep Workers Whenever handling tooling Job Order, print or visual identification of tooling Be sure the full die number is clearly metal-stamped on the tooling in a spot that is easily seen when the tooling is on a rack or the floor. For an insert or multiple-impression die, the suffix must follow the die number ("Z", "Y", "X" and so forth for insert holder ID; for multiples, "D" for 2-at-a-time, "T" for 3, "Q" for 4, "F" for 5, and "S" for 6). If tooling is shared by a group of dies then it either should be stamped with all die numbers, or with some code assigned by VP Quality & Engineering that he can trace back to all the dies that use it. All tooling clearly and prominently stamped so that it can be traced to die number(s) that use it
2 Die Shop and Die Prep Workers Whenever storing tooling Die number stamped on tooling (if multiple, use lowest die number); Die Storage Log If placing in temporary storage on floor or such, position so die number can easily be seen or clearly mark die number in paint stick so that it can easily be seen; if storing in racks, store dies, trimmers, etc. in the same space placing tooling on top of dies whenever possible; if tooling is too large to fit on top of dies, then store beside dies as close to dies as possible; write down all the information required by the Die Storage Log; (if any question as to organization of tooling racks, ask Die Prep Leadman) Tooling stored properly with die numbers visible and logged in the Die Storage Log
3 Die Shop and Die Prep Workers  Whenever retrieving tooling Upon finding tooling improperly marked or stored Die number stamped on tooling (if multiple, use lowest die number) Own observation Remove tooling from rack; write down all the information required by the Die Storage Log Immediately report problem to Die  Prep Leadman or Die Prep Supervisor Tooling retrieval logged in the Die Storage Log Die marking and storage problems not ignored
4 Die Shop and Die Prep Workers At end of shift Die Storage Log File Die Storage Log in Die Storage Log binder in Die Prep area Die Storage Log filed
5 Die Prep Supervisor or his designee Daily Die Storage Log binder Enter die storage log information into the Tooling program Tooling program updated daily

 

 

For information on a document or record, including definition, primary responsibility and retention, refer to the Document and Record Master List.

Documents are controlled only when viewed on-line in the original English -- printed copies or translations are not controlled documents.
© 2008 Trinity Forge, Inc.,  +1 817-473-1515